The purpose of the program is to reach a level of 95% associated gas utilization by 2011. The investment also includes the construction of a gas turbine electric power station of 50MW capacity, which will operate on casing-head gas from the company oil reserves.
“Gazpromneft-Hantos” (Russia) to invest USD 200 million in the program of casing-head gas utilization